|
Ünlü Polyurethane Lacquered Primer |
|
|
|
|
|
|
|
|
|
|
Ünlü Polyurethane Lacquered Primer |
| Product Code | : | 212 Series | | Color/Apperarance | : | 212-1002 WHITE | | | | 212-2000 OXIDE YELLOW | | | | 212-6000 BROWN | | | | 212-9100 BLACK | | Description | : | POLYURETHANE LACQUER PRIMER is a two pack polyurethane based reaction curing primer with excellent filling and covering properties. It results a well filled smooth surface with easy drying and sanding properties. It prepares a perfect surface for the top coat. |
| Product Code | : | 212 Series | | Color/Apperarance | : | 212-1002 WHITE | | | | 212-2000 OXIDE YELLOW | | | | 212-6000 BROWN | | | | 212-9100 BLACK | | Description | : | POLYURETHANE LACQUER PRIMER is a two pack polyurethane based reaction curing primer with excellent filling and covering properties. It results a well filled smooth surface with easy drying and sanding properties. It prepares a perfect surface for the top coat. |
| Application Field | : | POLYURETHANE LACQUER PRIMER can be applied on all types of wooden surfaces like veneer, MDF, chipboard and solid wood to prepare an ideal surface for cellulosic, polyurethane, acid curing, acrylic or polyester top coats. |
| Density (20°C , gr/cm³ ) | : | 1.45-1.55 | | Sanding (20° C) | : | Dust Drying : 15-20 min. | | | : | Touchin Drying : 50-60 min. | | | : | Complate Drying : 3-4 hrs. | | Solid Contetnt % | : | 71-75 (depending on the color) | | Thinner | : | 921-0221 Ünlü Polyurethane Thinner/ 961-0631 | | Dilution Ratio | : | 10-20% | | Hardener | : | 229-0130/0132 | | Mixing Ratio (By Weight) | : | POLYURETHANE LACQUER PRIMER (3 Kgs) POLYURETHANE LACQUER PRIMER HARDENER (1 KG) | | Pot-Life (20° C) | : | - | | Coverage | : | 10-12 m² of area is coated by 1kg product .(Excluding losses) |
| Application Method | : | Before application wooden surface should be sanded properly and cleaned from dust. Polyurethane Primer is prepared according to mixing and dilution ratios given above and is sprayed in two or three cross-wise applications introducing 20-30 minutes interval in between coats. 3-4 hours in summer, or the day after in winter after the application of the final coat, the surface is sanded. Preferably after one night, any of cellulosic, polyurethane, acid curing or polyester top coats applied. For further details please contact our technical staff. |
| Warning | : | Packages must be closed after use. Especially hardener must be closed immediately because of the reaction risk with the moisture.Since the system contains volatile and flammable solvents, ventillation should be applied in the workshop. Product should be kept away from flame and sources of ignition. |
|
|
|